

Quickfacts:
- Objectives of the restoration project were to:
- Improve Ecological Resilience: Physical changes will create diverse habitats; native vegetation will be densely planted to provide a biodiverse riparian buffer to provide habitat and food for a multitude of species.
- Creek Stabilization: Haskett Creek will be enhanced through addition of pools, riffles, and cross vane structure for grade control. It will also have regraded, vegetated streambanks to reduce sediment in watershed. Stabilization of the ephemeral tributary will extend the riparian corridor and protect the channel from future erosion.
- Public Recreation & Education: North Asheboro Park offers a range of passive and recreational amenities. Stormwater SMART will provide hands-on water quality education and interactive stewardship activities with the goal of guiding community members towards a deeper enjoyment of their neighborhood greenway and stronger sense of responsibility for stewardship.
October 2024 – Present
This project in North Asheboro Park aims to stabilize and enhance over 1,200 linear feet of Haskett Creek and the unnamed tributary. Because there was a void of buffers, the site suffered from excessive stormwater flows from surrounding urbanization, resulting in eroding streambanks. This project will establish a protected riparian buffer, create instream habitat features and stabilized the streambanks and riparian corridor.
Location:
- 1939 Canoy Dr, City of Asheboro in Randolph County; the Haskett Creek- Deep River watershed located within the Cape Fear River Basin, NC
Partners:
- Piedmont Conservation Council
- Backwater Environemental
- Piedmont Triad Regional Council
- Stormwater SMART
- City of Asheboro
- Kris Bass Engineering
Funding: $305,000
- NCLWF – $305,000.00
- In Kind Matching Funds:
- NCDEQ – $275,000.00
- City of Asheboro – $1,200.00
- PTRC Stormwater SMART – $5,511.00
